November 19, 2026 | 8 min read The Downtime Math That Finally Flipped for Food Manufacturing By: Tanya GoncalvesReviewed by: Ashley LockyerFact-checked by: Jason Afara Back to blog For years, food and beverage manufacturers had good reasons to be selective about maintenance investment. Production margins can be tight. Equipment is often specialized. Maintenance budgets compete with investments in capacity, quality, safety, automation, and new product lines. And when a predictive maintenance program requires new sensors, software, integration, and specialist expertise, the return can be difficult to justify. If an hour of downtime costs less than it does in another manufacturing environment, the business case for a sophisticated predictive maintenance program may not have been compelling. That doesn’t mean food manufacturing was ignoring maintenance. It means the economics of maintenance investment were different. But now, those same economics are changing. A combination of aging equipment, skilled labor shortages, knowledge loss, and growing access to predictive technologies is making it more important to understand where downtime occurs, what it costs, and which maintenance interventions can address it. The question for food and beverage manufacturers is no longer whether they have a preventive maintenance program or use a CMMS. It’s whether their maintenance strategy is delivering the planned work, equipment reliability, and financial outcomes for business needs. The answer starts with the right KPIs, and in this blog we’re going to cover exactly what food and beverage manufactures need to flip their downtime. For clarity, this article focuses on unplanned downtime caused by equipment and maintenance-related issues. Production interruptions can occur for many reasons, but the discussion below is limited to factors within the maintenance and asset reliability domain. Why is food manufacturing downtime increasing? Before we address strategies for downtime, we need to understand why the downtime equation for food and beverage manufacturing is changing. Aging equipment raises the cost of reactive maintenance Older equipment isn’t a problem. Well-maintained assets can operate reliably for decades. The issue is what happens when aging equipment sits on a critical production line; replacement parts become harder to source, or maintenance teams lose the knowledge needed to troubleshoot it quickly. “It’s common knowledge that food and beverage aging equipment maintenance is part of the weekly, monthly, and yearly priority cycles,” says Jason Afara, a former maintenance manager in food manufacturing, now a Director at Fiix by Rockwell Automation. A breakdown on a noncritical asset is not the same business event as a breakdown that stops a packaging line, disrupts a processing operation, or creates a production bottleneck. Maintenance investment should follow business risk, not equipment age alone. The cost of not maintaining assets in food manufacturing Fiix insight Looking at things a bit closer, small maintenance savings at the top of this flowchart create exponentially larger losses downstream. Deferred PM isn’t worth the larger costs later on. Labor shortages change the recovery equation Food and beverage maintenance teams are also operating in a changing labor environment. When experienced technicians retire or leave, organizations can lose more than headcount. They can lose practical knowledge that helps a team diagnose unusual failures, identify recurring problems, and restore equipment quickly. The broader maintenance implication is straightforward: when troubleshooting knowledge becomes harder to access, the cost of downtime can rise even if the equipment itself hasn’t changed. Predictive maintenance is becoming easier to evaluate Predictive maintenance has sometimes been treated as a difficult investment to justify in food manufacturing. If downtime costs are relatively low, a predictive maintenance system may appear too expensive compared with the value of the failures it could prevent. That assumption may have been reasonable in some operating environments. But it should not be treated as a permanent rule. Equipment costs, labor costs, production schedules, technology costs, and the financial consequences of downtime all change over time. A business case built several years ago may no longer reflect today’s operating environment. The opportunity is to revisit the numbers using the plant’s own maintenance and production data. Four maintenance strategies to address the downtime challenge The most useful maintenance metrics don’t simply report what happened. They help teams decide what to do next. For food and beverage manufacturers, four practical levers can connect the industry’s downtime challenges to measurable maintenance performance. 1. Measure planned work against what actually gets done A plant can have a preventive maintenance program on paper while technicians spend much of their time responding to breakdowns, chasing parts, or working through overdue tasks. The result can be a cycle: Planned work gets delayed. Equipment remains exposed to known failure risks. Reactive work increases. More planned work gets pushed aside. The solution is not simply to schedule more PMs. It is to understand how much work is planned, how much is unplanned, how much breaks into the weekly schedule, and whether scheduled PM and PdM work are being completed on time. Three metrics provide a useful starting point: Planned maintenance % The reactive maintenance ratio measures how much of your maintenance work is performed in response to equipment failures versus planned activities. It helps organizations understand whether they are spending most of their time fighting breakdowns or proactively preventing them. A high reactive maintenance ratio often indicates increased downtime, higher maintenance costs, and reduced asset reliability. Formula: Reactive Maintenance Ratio = (Reactive Maintenance Hours ÷ Total Maintenance Hours) × 100 PM compliance The share of scheduled preventive maintenance work completed within the defined due-date window. This helps answer: Are we executing the preventive maintenance we committed to? Together, these metrics reveal different parts of the problem. A plant with low PM compliance may have a scheduling, staffing, or execution issue. A plant with reasonable PM compliance but a low planned maintenance % may still be overwhelmed by reactive work. 2. Rank aging assets by criticality, then track reliability where it matters Age is an easy way to identify equipment that may need attention, but age alone is a weak prioritization tool. “Not every aging asset deserves the same maintenance response,” says Jason Afara. He adds that an older conveyor motor on a noncritical line may have little impact on production if it fails. An older filler, packaging machine, or refrigeration asset that constrains a critical process may create a much larger operational and financial consequence. “Which aging assets create the greatest risk to production, quality, safety, or cost? That requires criticality analysis,” says Jason. We recommend that you use criticality analysis with two key reliability KPIs: KPI What it addresses/solves Mean Time Between Failures (MTBF) Measures the average operating time between qualifying failures. For a selected asset or asset group, it can help answer: How frequently is this equipment failing? Mean Time to Repair (MTTR) Measures the average time required to restore an asset after a qualifying failure, according to the organization’s defined start and end points. It helps answer: When this equipment fails, how long does it take to get it back into service? Your next steps should combine criticality analysis with asset-level reliability data. For the highest-priority assets: Identify assets with the greatest business impact. Establish a baseline for MTBF and MTTR. Review failure history and recurring failure modes. Check whether preventive maintenance tasks address the actual failure mechanisms. Evaluate whether condition monitoring, redesign, spare parts, or replacement would reduce risk. This is where maintenance investment becomes more targeted. 3. Treat maintenance knowledge as an asset worth measuring One of the less discussed contributors to downtime is the loss of practical maintenance knowledge. Experienced technicians often know how to recognize unusual sounds, identify intermittent faults, and bypass hours of unnecessary troubleshooting. “Skilled labor loss can extend downtime even when equipment hasn’t changed, when that knowledge leaves the organization, the impact may not appear immediately in a maintenance budget. It may show up in: longer troubleshooting times, more failures, and more frustration,” says Jason. Some metrics to consider: Labor and skills. The SMRP framework includes an organization and leadership pillar, which creates an opportunity to connect workforce capability with maintenance performance. Useful workforce measures may include: Training completion: Are technicians completing the training required for the equipment, processes, and maintenance tasks they support? Skills coverage: Does the team have the required capabilities across critical assets and shifts? Time to competency: How long does it take for a new or reassigned technician to perform defined tasks independently? Troubleshooting or recovery time by skill level: Where appropriate, does recovery time differ depending on the availability of experienced technicians or specialized skills? Your next steps should consider building knowledge capture into the maintenance workflow. For critical assets, consider documenting: Standard troubleshooting procedures (i.e., SOPs). Common failure symptoms and causes. Equipment-specific repair instructions. Critical spare parts and escalation contacts. Lessons learned from major breakdowns. Training requirements for less familiar equipment. A CMMS can serve as a practical place to organize and share this information, provided the content is maintained and accessible to technicians. The objective is not to replace experienced technicians with documentation. It’s to make their expertise available to the broader team. 4. Revisit the predictive maintenance ROI business case using downtime cost Predictive maintenance has sometimes been treated as a difficult investment to justify in food manufacturing. If downtime costs are relatively low, a predictive maintenance system may appear too expensive compared with the value of the failures it could prevent. “Yesterday’s ROI assumptions may no longer hold; a business case built several years ago may no longer reflect today’s operating environment,” says Jason. He recommends that teams look at two financial measures that can help translate maintenance performance into business language: Downtime cost and cost per unit. KPI What it addresses/solves Downtime cost Estimates the financial impact of equipment or production interruption. Cost per unit Measures the cost associated with producing a defined unit of output. Used together, these two metrics help answer a practical question: What is the financial consequence of a failure, and how much improvement would justify a maintenance investment? “Teams should consider a re-run on the predictive maintenance business case for critical assets,” says Jason. He adds that for each asset or line under consideration, estimate: Historical failure frequency. Average downtime per failure. Estimated downtime cost. Potential failure modes that condition monitoring could detect. Expected intervention or avoidance benefit. Implementation, integration, and ongoing operating costs. Fiix insight For example, a predictive maintenance program may be difficult to justify for a low-cost, noncritical asset. But the same technology may be economically attractive for a critical production bottleneck where failures create extended downtime, product loss, or expensive recovery work. This is also where newer AI-enabled maintenance capabilities may change the equation. The opportunity is not to maintain everything differently Food and beverage manufacturing has always had to balance reliability, cost, production demands, and operational realities. The fact that predictive maintenance may have been difficult to justify in the past does not mean those decisions were careless. It means maintenance strategies must respond to the economics and constraints of their environment. Today, the combination of aging assets, workforce changes, and evolving technology creates a reason to revisit those assumptions. The practical response is not to chase every new maintenance technology or maximize every KPI. It’s to understand where downtime is costing the business, which assets matter most, whether the team has the skills and capacity to respond, and what level of maintenance investment can produce a measurable return. The downtime math has changed. The next step is to make that change visible in the metrics. Frequently asked questions How to calculate MTTR in food manufacturing? Mean Time to Repair (MTTR) measures the average time required to restore equipment to normal operation after a qualifying failure based on the organizations defined start and end points. In food manufacturing, MTTR should include troubleshooting, repairs, parts replacement, testing, sanitation activities (if required), and restarting production. Formula: MTTR = Total Downtime for Repairs ÷ Number of Repair Events For example, if a packaging line experiences four breakdowns that require a total of 12 hours to repair, the MTTR is 3 hours. Lower MTTR values generally indicate more efficient maintenance processes and faster recovery from equipment failures. What causes downtime in food and beverage plants? Downtime in food and beverage plants can result from equipment failures, unplanned maintenance, operator errors, changeovers, sanitation requirements, parts shortages, and supply chain disruptions. Common problem areas include conveyors, packaging equipment, pumps, refrigeration systems, and processing machinery. Many facilities also experience downtime when critical spare parts are unavailable or when maintenance issues are identified too late to prevent a breakdown. Effective preventive maintenance, condition monitoring, and spare parts management can significantly reduce these disruptions. What is the best food plant maintenance strategy for reducing downtime? An effective food plant maintenance strategy combines preventive maintenance, predictive maintenance, operator inspections, and data-driven decision-making. Rather than relying on a single approach, leading food manufacturers use a layered strategy that prioritizes critical assets, monitors equipment health, and schedules maintenance before failures occur. This helps improve reliability, maintain product quality, and reduce costly production interruptions. How does the maintenance labor shortage affect the food industry? The maintenance labor shortage in the food industry makes it more difficult to complete inspections, preventive maintenance tasks, and repairs on time. Many plants are facing challenges recruiting and retaining experienced technicians, while existing teams are expected to manage increasingly complex equipment. To address this issue, organizations are adopting maintenance software, standardizing procedures, and prioritizing work based on asset criticality to maximize limited resources. How can food manufacturers reduce unplanned downtime in a food plant? To reduce unplanned downtime in a food plant, organizations should focus on asset criticality, preventive maintenance compliance, condition monitoring, operator care programs, and root cause analysis. Using maintenance data to identify recurring failure patterns can help teams address underlying issues rather than repeatedly fixing symptoms. Many facilities also use CMMS and predictive maintenance tools to improve planning, scheduling, and asset visibility. Why is predictive maintenance becoming more important in food manufacturing? Predictive maintenance is becoming increasingly important because food manufacturers are under pressure to maximize production capacity while controlling labor and maintenance costs. By identifying developing equipment issues before failure occurs, predictive maintenance helps minimize downtime, reduce waste, improve maintenance efficiency, and support more reliable production operations. References Society for Maintenance & Reliability Professionals. (2020). SMRP best practices (6th ed.). SMRP. (opens in new tab) (opens in new tab)